时时彩3把赢了200万

经典案例   Excmple
搜索   Search

奈普顿(Neptune)旋挖钻机专用聚合物泥浆

产品使用说明书

Operating Manual of Neptune Special Polymer Mud for Rotary Drilling Rig

YI、KONGYAJIZAOJIANGFA 

I. Mud Making with Air Compressor 

1、SHIGONGZHUNBEI:WAYIGENIJIANGCHI,GENJUYONGLIANGQUEDINGNIJIANGCHIDEDAXIAO,BINGZAICHIBIANANZHUANGHAONIJIANGBENGHEKONGQIYASUOJI,ZHOUBIANZUOHAOFANGHU。

1. Preparation for construction: Excavate a mud sump, determine its size according to use level, install mud pump 
and air compressor beside the sump, and take protective measures around it. 

2、JIANGQINGSHUIZHURUNIJIANGCHIHOU,YONG20%QINGYANGHUANA(YOUMINGSHAOJIAN、HUOJIANHUOPIANJIAN)RONGYEDIAOJIESHUIDEPHZHIZAI8-10ZHIJIAN,YONGKONGYAJIJIAOBANJUNYUN(JIAOBANSHIJIANWEI10-20FENZHONG)。

2. Pour clear water into mud sump, adjust the PH value of water to be 8-10 with 20% sodium hydroxide (also named as caustic soda, caustic flake), and mix them evenly with air compressor
(mixing for 10-20min). 

3、JIANGXUNHUANBENGDAKAI,JINXINGZIXUNHUANHOU,TONGGUOBENGCHUSHUIGUANKOUJIARUBENCHANPIN,YAOQIUMANMANJUNYUNJIARU,SHOUCISHIYONGSHIYIBANCAIYONGZUIDALIANGSHIYONG,JIALIANGWEIWANFENZHIWU(JI100LIFANGSHUIZHONGJIARUBENCHANPIN50KG,HOUYONGKONGYAJIJIAOBAN10FENZHONG,YONGGONGCHENGLOUDOUCEDINGRONGYEDENIANDUDAO22MIAOZUOYOUJIKEMANZUYIBANGONGCHENGDIZHI。(YIBANQINGKUANGXIASHOUGANSHAOYOUZHANDUQIXIANSIZHUANGJIKE,TESHUDIZHIGENJUSHIJIQINGKUANGERDING)。

3. Open the circulating pump. After self-circulation, add the product slowly and evenly from the orifice of the pump’s discharging tube. Use the product, 
if for the first time, according to the maximum use level, and generally, add 0.05% of this product (namely add 50Kg
product to 100m3 water). Then, mix the product for 10min with air compressor, and use engineering funnel to
measure the viscosity of the solution. The viscosity of around 28s could meet common engineering geology 
(generally, it’s ok if it feels slightly sticky and filamentous line forms; the viscosity for special geology may be
determined according to actual situations).

4、RUONIANDUGAOYU22MIAO,KEZHIJIEJIASHUIXISHI:RUONIANDUXIAOYU22MIAO,KENENGSHIYOUYUJIAOBANSHIJIANBUGOU,XUYANZHANGJIAOBANSHIJIAN,RUGUORENGDABUDAONIANDU,KEDAKAIXUNHUANBENGZIXUNHUANHOUTONGGUOCHUSHUIKOUBUCHONGBENCHANPIN,BINGZAIYONGKONGYAJIJIAOBANJIXUJIAOBAN,ZHIZHIMANZUTIAOJIAN。

4. If the viscosity is higher than 28s, the product may be diluted with water directly; if it is lower than 30s, the mixing
time is probably not enough, and shall be extended. If the viscosity is still not enough, we may open the circulating
pump for self-circulation, then supplement this product through water outlet, and mix the product continuously with air compressor,
until related conditions are satisfied. 

5、ZAIZUANJINGUOCHENGZHONG,RUGUOHANSHACENGJIAODUO,YAOTIQIANZHUNBEIHAOZUGOULIANGDENIJIANG,BINGZAIZUANJINGUOCHENGZHONGBUDUANBUCHONGNIJIANG,BAOCHIZUANJINYEMIAN,QUEBAODICENGYALIPINGHENG。

5. If there are many sand-containing layers in drilling process, we shall prepare sufficient mud in advance, and constantly supplement mud in
drilling process to maintain the drilling liquid level and ensure balanced strata pressure. 

6、ZUANJINWANCHENGHOU,TING15-40FENZHONGHOU,(GENJUKONGSHENJUEDINGSHIJIAN)YONGZUANJIDALAOYICICHENJIANGXIAQUDESHAZIDENGZAZHI,BUYAOKONGJIANG。RANHOUXIAFANGGANGJINLONGHEHUNNINGTUDAOGUAN,YIBANQINGKUANGXIADOUNENGDADAOGUANZHUZHUANGYAOQIUDEHANSHALIANGHECHENSHALIANG,GEBIEDICENGKENENGHUICHUXIANCHENSHALIANGJIAODUODEQINGKUANG,JIUKEYIZAIXIAGANGJINLONGZHIQIANDUOLAOLIANGCI,YIQUEBAOXIAWANGANGJINLONGHEDAOGUANHOUCHENZHADABIAO。

6. Stop for 15-40min (depending on the depth of holes) after completion of drilling, and use the drilling rig to get out the impurities
such as sand, etc. settled without controlling the mud. Then, lay down the reinforcing cage and concrete conduit.
Generally, it’s available to reach the sand content and sand settling quantity; on some individual strata, there will
probably be plentiful sand settled, so we need to drag for more times before laying down reinforcing cage, 
in order to ensure the up-to-standard sediment after laying down reinforcing cage and conduit. 

7、GUANZHUANGWANHOU,FANHUIDENIJIANGXUYAOQIUQINIANDU,RUGUONIANDUDIYU20MIAO,KEYIDAKAIXUNHUANBENGZIXUNHUANHOUTONGGUOCHUSHUIKOUBUCHONGBENCHANPIN,BINGYONGKONGYAJIBUTINGJIAOBAN,ZHIZHIMANZUTIAOJIAN。TONGSHI,ZAILINGWAIYIGENIJIANGCHIZHONGPEIZHIXINDENIJIANG,YIMANZUXIAYIGEZHUANGZUANKONGSUOYONG。

7. After completion of pile pouring, we need to measure the viscosity of the mud returned. If the viscosity is lower
than 30s, we may open the circulating pump for self-circulation, then supplement this product through water outlet, and mix the product continuously with air compressor,
until related conditions are satisfied. Meanwhile, we shall prepare new mud in another mud sump in order to meet
the use of the next borehole. 

ER、KONGNEIZHIJIEZAOJIANGFA 

II. Direct Mud Making in Holes

JINGGUODUONIANXIANCHANGSHIJIYINGYONG,YIXIEXIANGMUYINCHANGDITIAOJIANDENGYUANYINBUJUBEIKONGYAJIZAOJIANGFASHIGONG,WEILEBAOZHENGNIJIANGZHILIANGHEJIANSHAOZAOJIANGSHIJIANDENG,WOGONGSITEYANFASURONGXINGNAIPUDUNXUANWAZUANJIZHUANYONGJUHEWUNIJIANG。CICAILIAOZAIXIANGMUSHIYONGZHONGJIDADEJIANSHAONIJIANGZHIBEISHIJIAN,TIGAOLESHIGONGXIAOLV。

For reason of site condition, some projects cannot execute mud-making with air compressor according to onsite practical applications over the past years. In order to ensure mud
quality and reduce mud making time, etc., the Company has specially researched and developed instant Neptune
special polymer mud for rotary drilling rig. This material has greatly reduced mud making time and raised
construction efficiency in projects. 

1、ZAIZUANKONGQIANTIQIANZHUNBEIHAONAIPUDUN(Neptune)NIJIANGCAILIAO,GENJUDICENGQINGKUANGJISUANCHUZONGYONGLIANGHESHIGONGMEIMIDEPINGJUNYONGLIANG。

1. Prepare Neptune mud material in advance before drilling, and calculate the total use level and the average use
level per meter according to stratum conditions. 

2、ZUOYIGEJIALIAODOU,NENGSHICAILIAOHEPIANJIANCHONGFENRONGHUABUJIEKUAI。

2. Make a loading hopper, ensuring the sufficient thawing of the material and caustic flakes. 

3、ZAIHUTONGNEIXIANJINXINGNIJIANGDEPEIZHI,HUTONGNEIPEIZHIYONGLIANGWEIPINGJUNYONGLIANGDE1.5——2BEI。ZAIZUANJINDAOHUTONGDIBUYIXIA3MHOU,JIALIANGANZHAOPINGJUNYONGLIANGTIANJIAJIKE。

3. Prepare the mud in advance in the pile casing. The quantity prepared in the pile casing is 1.5-2 times the average use level. After drilling to 3M below the bottom of pile casing, add the product according to
average use level. 

4、ZAIZHENGCHANGSHIGONGSHI,ZAOJIANGYAOZHUANRENFUZE,BAOZHENGNIJIANGYEMIANGAODU。TIANJIAJUHEWUNIJIANGSHIJIAN、CISHUHEZHONGLIANGYANGEANZHAOJISUANDEPINGJUNLIANGPEIZHI。

4. During normal construction, a special person shall be dispatched to take charge of mud making, in order to
ensure the height of mud liquid level. The time, frequency and weight of polymer mud added shall be executed
according to the average quantity calculated. 

5、ZAIZUANKONGZHIJIANGJINSHEJIKONGSHEN3-5MISHI,KETINGZHITIANJIAJUHEWUNIJIANG。

5. It’s available to stop adding polymer mud after drilling to the designed hole depth of 3-5m. 

6、RUYUSHACENGLUANSHICENGGUODA、KONGBIBUWENDING、LOUJIANGLIANGGUODASHI,GENJUSHUILIANGSHIDANGDIAOZHENGCAILIAOYONGLIANG。

6. In case the sand layer and pebble bed are over big, the wall of hole is unstable, and leakage of mud is over big,
the use level of the material may be adjusted properly according to the water quantity. 

SAN、 YONGLIANG 

III. Use Level

YIBANQINGKUANGXIABILIAN0.01%~0.1%PEIZHI,GENJUXIANCHANGSHIDIQINGKUANGSHIYANQUEDINGPEIHEBILI。CANKAOZHIBIAO:RUXIA

Generally, the product shall be prepared as per the proportion of 0.01%~0.1%, and the mix proportion
shall be determined according to site conditions. The reference indexes are as shown below: 

地层状况 

Stratum condition

Neptune泥浆(公斤立方水)

Neptune mud (Kg/m3 water)

粘度(秒)

Viscosity (second)

粘土与页岩 

Clay and shale

0.2-0.6

18-30

淤泥,细到中砂 

Sludge, fine and medium-sized sand

0.3-0.7

20-32

粗砂,较小的砾石

Coarse sand, little gravel

0.4-0.9

22-35

卵砾石 

Gravel cobble

0.5-1.1

24-45

倡导科技 | 服务全球

聚合物泥浆全球领导品牌

奈普顿

NEPTUNE

旋挖施工泥浆解决专家

全国统一客服专线:4006-110-178